Distribution transformers,
quoted by conversation.

Pad-mount, substation, dry-type or cast-coil — describe the unit and the engine checks DOE efficiency, NEC 450 siting, insulation level and fusing by citation, prices Good / Better / Best, and shows the fault current your switchboard must handle. Every number comes from the rules, never from a guess.

What it quotes

Pad-mounted liquid-filled (three- and single-phase), substation units, dry-type general purpose and cast-coil — 15 to 10,000 kVA, primaries from 480 V to 34.5 kV, mineral oil, natural ester, silicone or dry.

What it checks

DOE efficiency (10 CFR 431.196) at the current level and the 2029 level; NEC 450 siting — oil indoors needs a vault, with ester, silicone and dry-type as the ways out; BIL by voltage class (IEEE C57.12), fusing, K-factor harmonic loads and solar step-up (IEEE C57.159).

On every quote

The secondary fault current the downstream switchboard must handle — shown with its arithmetic (rated current over impedance) — plus the site responsibilities an engineer expects, stated rather than buried.

Cited rules decide what may be built and where it may sit — and every size, price and refusal shows its source.

Sign up free → Use it in Claude

Free to use — Nteli is paid only when an order is won through it.

The rules under this product move from four directions at once.

A transformer quote built in a spreadsheet goes stale the day one of these shifts. The engine doesn’t watch for changes — people teach it: a change comes in with its source, gets replayed against past quotes to show what it touches, is approved by a second person, and ships in a versioned pack. Your quotes cite the rule that priced them.

DOE 2029

The April 2024 final rule raises efficiency levels for units made from April 23, 2029 — and DOE’s 2026 review of those levels is open now.

Section 232

The steel duty reaches transformers (HTS 8504), and the allowance on a quote has to be stated, not hidden in the margin.

NEC revisions

Article 450 decides where each liquid and dry-type may sit — vaults, clearances, less-flammable fluids — and it moves on the code cycle.

Year-plus lead times

At 30–60 weeks, a quote priced on last year’s rules is delivered under next year’s — the compliance date belongs on the quote.

The engine is a full MCP server — connect it to Claude and your team quotes distribution transformers in plain conversation: describe the unit, answer the question card, pick Good / Better / Best. The starter rule pack ships with the line; override it with your own rules, governed and audited — and you're onboarded.

Try it in Claude — right now.

Connect the engine as a custom connector (two steps, shown here), then paste any of these. They were run on the live engine; prices are illustrative until your price book loads.

THE REFUSAL
“Quote a 1,500 kVA pad-mount, 12.47 kV to 480Y/277, mineral oil, installed inside the building.”

What you’ll see: Mineral oil indoors without a vault is refused under NEC 450.26 — with four ways out, each priced: natural ester from about $127,000 (the usual choice), a vault from about $120,000, silicone from about $137,000, or a dry-type unit.

THEN ASK — same chat as the prompt above
“Same unit outdoors at the 2029 DOE level. What fault current must the switchboard handle, and what if we go low impedance?”

What you’ll see: A 99.51% minimum-efficiency build (10 CFR 431.196, 2029 level) at about $128,000 — and the fault-current arithmetic in the open: about 31.4 kA at the standard 5.75% impedance, 36.1 kA if you go low impedance, so the switchboard rating is decided before the order, not after.

“2,500 kVA solar step-up at 34.5 kV with a 600 V inverter winding.”

What you’ll see: A step-up design to IEEE C57.159 — electrostatic shield, built for no-load nights and inverter harmonics — at about $182,000. And a detail estimators catch: no bayonet fuse is published at 34.5 kV, so the primary is protected upstream per NEC 450.3, stated on the quote.

The engine also quotes
Data Center Pods Control Panels & Switchgear Hazardous-Area Electrical Interconnect / Cable Assemblies Commercial HVAC Pumps & Packaged Skids Electronic Components & Assemblies Safety & Plumbing Equipment Lab Furniture & Fume Hoods Fire Doors & Hardware Cooling Towers Medical Gas & Headwalls Water Treatment Kitchen Ventilation Cranes & Hoists Commercial Boilers

The four manufacturing levers  ·  Estimate your leak ledger  ·  The benchmark rates, with the math  ·  The Leak Ledger Workshop

Skeptical? Send us a real RFQ.

One you quoted recently, names removed. You’ll get back what the engine produces — compare it with yours. No deck, no pitch.