The Leak Ledger Method · Assumptions

Revenue leakage assumptions, explained.

These are the ten assumptions behind the leak-ledger calculator and the ledger table in A ledger, not a dashboard. One model, one set of numbers, every line's arithmetic shown, and every assumption editable in the calculator.

What these numbers are, and aren't. They are illustrative assumptions, tuned so the model describes a fictional ~$90M configure-to-order manufacturer (“Calder”) with dealers, a distributor channel and a service business. They are not measured industry averages, and we don't present them as anyone's research. For an outside reference point, MGI Research frames fixing revenue leakage as worth 2–4% in added revenue and cash flow; this model lands at about 3% of revenue. The numbers that matter are yours: change the assumptions in the calculator, or replace them with your own data in a Leak Ledger Workshop.

Two kinds of money

Recoverable cash can still be collected: correct an invoice billed off contract, bill an order entered below its quote, claw back an overpaid rebate, dispute an unsupported claim. Preventable margin is already gone: last year's discounts and rework can't be taken back, only stopped going forward. Each error counts in one line only.

The ten lines

bases for Calder: revenue $90M · quoted value 40% = $36M · distributor revenue 7% = $6.3M · service and spares 12% = $10.8M

Ledger lineAssumptionThe arithmetic (Calder)Kind
Configurations that couldn't be built as quoted≈1.1% of quoted value reworked after the order; ≈82% preventable with checked configurations$36M × 1.144% = $412K · × 82% = $338KPreventable margin
Required options left off buildable quotes≈0.8% of quoted value; ≈88% preventable when required options are priced in by rule$36M × 0.794% = $286K · × 87.8% = $251KPreventable margin
Unexplained discounting beyond peers≈1.5% of quoted value discounted deeper than similar deals without a recorded reason; ≈73% preventable with a peer band at quote time$36M × 1.494% = $538K · × 72.9% = $392KPreventable margin
Orders entered below the accepted quote≈0.5% of quoted value; ≈93% recoverable by billing the accepted price$36M × 0.483% = $174K · × 92.5% = $161KRecoverable cash
Price conceded between quote and order≈0.6% of quoted value given away at the close without approval; ≈76% preventable with margin-visible approvals$36M × 0.614% = $221K · × 76% = $168KPreventable margin
Invoices billed off the contract price≈0.2% of revenue; ≈88% recoverable by correcting the invoice$90M × 0.218% = $196K · × 87.8% = $172KRecoverable cash
Pass-through costs absorbed≈0.16% of revenue in material or freight increases with no surcharge applied; ≈83% preventable with surcharge rules$90M × 0.159% = $143K · × 83.2% = $119KPreventable margin
Service and spares quoted off the price book≈1.2% of service and spares revenue; ≈74% preventable with one price book$10.8M × 1.176% = $127K · × 74% = $94KPreventable margin
Rebates and commissions overpaid≈0.3% of revenue paid on units not shipped or not qualifying; ≈80% recoverable by clawback$90M × 0.293% = $264K · × 79.9% = $211KRecoverable cash
Channel claims paid unsupported≈5% of distributor revenue in ship-and-debit claims or chargebacks paid without a matching agreement or resale record; ≈73% recoverable by dispute$6.3M × 5.048% = $318K · × 73.3% = $233KRecoverable cash
Totalabout 3% of revenue$2.68M leak · $0.78M recoverable cash · $1.36M preventable margin

Rates are shown rounded in the second column; the calculator uses the unrounded defaults so the illustration reproduces exactly. They are tuned to the illustration, not measured.

Other starting points

The calculator offers two more starting points that change only the mix, not the rates: a semiconductor or electronics company with a large distributor channel (25% quoted, 45% through distributors, 2% service) and a pharmaceutical manufacturer selling through wholesalers (no configured quotes, 70% through wholesalers filing chargebacks). Adjust both to your business.

“Can't I do this in a spreadsheet?”

You can total it in one. The ledger isn't the arithmetic on this page. It's matching quotes, orders, invoices and claims that share no ID, checking every line instead of a sample, and stopping the error before the money moves. Bring your spreadsheet to a workshop and run the same quarter side by side.

The capacity assumption: a hand-built quote for a configured product takes a senior estimator most of half a day — call it ~2 quotes per estimator per day. On the engine the conversation does the assembly and the rules do the checking, so the same team handles roughly 3× the quote volume. This is an assumption to test on your own RFQs, not a measured result.
Change the assumptions → Replace them with your data — the workshop